Office fit-out cost calculator fit-out · modernization · renovation

Calculate your office preparation budget before you start negotiating the lease

The Ecoffices calculator helps you quickly check what budget should be planned for preparing an office and which decisions have the strongest impact on cost. In one place, you can compare a fit-out from scratch, modernization and renovation, review risk, delivery time, landlord contribution and generate a report for further discussion.

Ecoffices Engine

Office Fit-Out Cost Calculator 2026 version / server-side model

Ecoffices proprietary analytics engine. Change the options and the investment budget will update automatically based on market data, office fit-out standard and the landlord contribution model.
1 Brief for Initial Cost Estimate
Complete a short brief. Based on these inputs, the engine will define the assumptions and show an indicative cost.
Number of Employees (Target)
Work Model
Space Program Details (meeting rooms, offices, pantry, server room)
Workstations

Hint

Desk Ratio
desks / employee
Shared Desk Share
share of 4h desks
Modelled Occupancy
people at the same time
Meeting Rooms
Meeting Room Glazing
Offices
Office Glazing
Glazing Parameters
Activated when glazing is selected for meeting rooms or offices.
Additional Areas (pantry, storage)
Server Room / IT Back Office
A dedicated server room increases the space program area and raises the cost of electrical installations, ventilation, air conditioning and cooling.
2 Construction Parameters
Area and Base Cost
Shell & core: construction works + finishes + installations.
Fit-Out Standard
Eco Start
Eco Flow
Eco Signature
Schedule / Logistics
Landlord Contribution Logic
New office fit-out: 200-700 EUR/m², converted by the engine into PLN using the base exchange rate.
Modernization and Refurbishment: 100-500 EUR/m², also converted into PLN and included as the landlord's share of the works cost.
Investment Options
Advanced (fire protection systems, project management, resource retention)
3 Furniture and IT
Package: desk + chair + mobile pedestal / cabinet.
Link copied to clipboard.
The values are invalid. The minimum area is 30 m².
Verify Your Scenario with an Ecoffices Engineer
Send the full set of calculator parameters to the Ecoffices team. After submission, we save the technical brief and can send a scenario summary to the e-mail address provided.
The result is indicative and the final quotation requires verification of the scope, documentation and delivery conditions.
Ecoffices Report (Live)
Parameter changes update the indicators and charts.
Total Cost (NET)
Indicative, based on calculator parameters
Cost / m² (NET)
For variant comparison
Risk Range
Delivery Time

Area: Standard + Program + Volume

Cost Breakdown (Model)

Cost Waterfall: How the Budget Builds Up

The chart updates with the selected options: glass, resource reuse, project management, furniture, etc.

Carbon Footprint (CO₂e)

How we calculate it (simplified model)
The baseline CO₂e footprint depends on the standard: Eco Start 190 kgCO₂e/m², Eco Flow 235 kgCO₂e/m², Eco Signature 305 kgCO₂e/m². The Ecoffices reference level is 240 kgCO₂e/m². Resource reuse can reduce the indicative result by up to approx. -35% at 70% resource retention. A full life-cycle audit requires material and installation data.

Cost Structure (List)

    ECOFFICES - OFFICE FIT-OUT GENERAL CONTRACTOR
    By default, all amounts are NET. This calculation is indicative and does not constitute a commercial offer. The landlord contribution model assumes 200-700 EUR/m² for a new office fit-out and 100-500 EUR/m² for refurbishment or modernization, converted into PLN by the engine.
    Contact us about cost estimation and delivery: [email protected].
    Related Ecoffices calculators

    The fit-out budget is an important step, but a complete decision also requires area, TCO and carbon footprint analysis

    The CAPEX calculator shows the entry cost of preparing an office space, but it does not yet answer three key questions: whether the assumed area is correct, what the full lease cost will be over time, and what ESG footprint a given scenario will generate. That is why it is worth completing the analysis with the test-fit calculator, TCO calculator and Carbon Engine.

    Four Ecoffices calculators create one coherent decision-making model: area → investment cost → occupancy cost → carbon footprint.

    Ecoffices CAPEX Engine — office calculation methodology

    How the Ecoffices calculator estimates office CAPEX: scope, standard, area, glazing and comparison scenarios

    The Ecoffices calculator is not a simple area multiplied by one average rate. Its purpose is to show how the office preparation budget changes depending on the investment scope, standard, functional program, installations, glazing, furniture, resource retention, landlord contribution, risk and delivery time. In this section, we explain the transparent assumptions of the model: what the user should understand before interpreting the result.

    Three investment scopes
    The model separates fit-out from shell & core, modernization of an existing office and refurbishment / standard reinstatement. Each scope has a different base and a different cost structure.
    Base cost as the starting point
    If add-ons are disabled, the result starts from the base. Glass, furniture, IT/AV, systems and PM are added as separate decisions, not hidden mark-ups to the rate.
    Decision comparison
    The scenarios show not only different areas, but the real investor choice: new office, modernization or reinstatement refurbishment.
    Ecoffices CAPEX Engine comparison dataset

    15 office investment scenarios: fit-out, modernization and refurbishment

    The set below is not a price list. It is a structured scenario dataset showing the differences between three decisions: building a new office from shell & core, modernizing an existing space and refurbishing / reinstating the standard. This makes it possible to compare not only cost per m², but also technical scope, risk, time, landlord contribution and the cost that remains on the tenant side.

    Number of scenarios 15 5 fit-out · 5 modernization · 5 refurbishment
    Area range 215–2,600 m² from a small office to a large headquarters
    CAPEX / m² range €219–€1,442/m² depending on scope and standard
    Decision type build / reuse / restore new office, retention or reinstatement
    How to read the scenarios: values are model-based and indicative. The purpose is not to provide one market price, but to show what happens to the budget when the investment scope, functional program, glazing acoustics, EI / REI requirements, technology, resource retention and landlord contribution change. Amounts are displayed in EUR. Source values are calculated in PLN and converted using the NBP EUR/PLN rate when available.
    Office CAPEX comparison scenarios — Ecoffices CAPEX Engine 2026
    Scenario Scope Investment profile Area Team Work model Standard Base / m² CAPEX / m² CAPEX net Landlord contribution Tenant CAPEX CAPEX vs rent Schedule Risk Fit-test Glazing Furniture Systems CO₂e Main driver Conclusion
    F1Fit-out 215 m² Eco Start fit-out Small office from shell & core 215 m² 16 people Mainly office-based Eco Start €526/m² €526/m² €113,000 0% / €0 €113,000 1.7x 20 weeks ±10% Tight fit, 72/100 optional, standard acoustics outside the base / optional basic 31.3 t / 146 kg/m² fit-out base and simple program This scenario shows a reference point for a new office in the Eco Start variant. With add-ons disabled, the cost remains anchored in the base and the result is clear for discussing further options.
    F2Fit-out 480 m² Eco Flow fit-out Business office with meeting rooms 480 m² 46 people Hybrid Eco Flow €716/m² €802/m² €385,116 22% / €86,047 €299,070 2.4x 21 weeks ±12% Comfortable, 84/100 approx. Rw 43 dB, selected rooms optional workstation package FAS / basic approvals 108.0 t / 225 kg/m² meeting rooms, glazing and HVAC A typical business-office scenario. The difference versus the base comes from the program, glazing and an extended technical layer, not only from area.
    F3Fit-out 950 m² Eco Flow + IT fit-out Office with more meeting rooms and IT 950 m² 86 people Hybrid Eco Flow €716/m² €926/m² €879,302 25% / €216,279 €663,023 3.1x 23 weeks ±14% Tight fit, 80/100 approx. Rw 49 dB, meeting rooms + offices partly included FAS, basic BMS, IT/AV 285.0 t / 300 kg/m² IT/AV, glazing and installations In this variant, the cost increases through technical elements: IT/AV, a higher share of glazing and more intensive installation coordination.
    F4Fit-out 1,500 m² Eco Signature fit-out Representative office for a service company 1,500 m² 125 people Office-based hybrid Eco Signature €1,209/m² €1,349/m² €2,023,256 28% / €566,512 €1,456,744 4.0x 25 weeks ±16% Tight fit, 82/100 enhanced acoustics, selected EI/REI workstation package + common areas FAS, BMS, sprinklers, extended AV 690.0 t / 460 kg/m² representative standard and systems This scenario shows that a high standard quickly multiplies CAPEX. The key is to separate the visual effect from technical and system requirements.
    F5Fit-out 2,400 m² HQ fit-out Headquarters with server room and technology 2,400 m² 200 people Hybrid-office-based Eco Signature €1,209/m² €1,442/m² €3,460,465 28% / €968,930 €2,491,535 4.4x 25 weeks ±16% Tight fit, 79/100 Rw 49 dB and >50 dB, EI/REI possible full workstation package as an option FAS / voice alarm / BMS / sprinklers / server room 1128.0 t / 470 kg/m² scale, server room and building systems In a large HQ, the cost difference does not come from a single material, but from the sum of decisions: layout, systems, server room, AV/IT, glazing and logistics.
    M1Modernization 300 m² modernization Local rearrangement of an existing office 300 m² 30 people Mainly office-based efficient modernization €321/m² €356/m² €106,744 0% / €0 €106,744 1.2x 14 weeks ±10% Comfortable, 86/100 existing walls retained optional additions local corrections 57.0 t / 190 kg/m² intervention scope in the existing layout The greatest value of modernization is the ability to use what already exists. The cost depends on the existing-condition audit and the scale of functional changes.
    M2Modernization 700 m² Eco Flow modernization Modernization with partial resource retention 700 m² 64 people Hybrid comfortable modernization €486/m² €523/m² €366,279 0% / €0 €366,279 1.8x 17 weeks ±12% Comfortable, 88/100 partial retention, new rooms Rw 43/49 dB partial workstation additions local HVAC / electrical works 119.0 t / 170 kg/m² resource retention and meeting room change scope This scenario clearly shows the advantage of modernization: lower CAPEX and a lower carbon footprint when part of the infrastructure is retained.
    M3Technical modernization 1,100 m² modernization Rearrangement with major installation changes 1,100 m² 100 people Hybrid comfortable modernization €486/m² €616/m² €677,907 20% / €135,581 €542,326 2.4x 20 weeks ±14% Tight fit, 81/100 new rooms Rw 49 dB, some system doors optional workstation package FAS / BMS depending on the building 231.0 t / 210 kg/m² installation clashes and layout change Technical modernization requires caution: the cost may approach a new fit-out if layout changes trigger a broad rebuild of installations.
    M4Modernization 1,800 m² with retention modernization Large office with high resource retention 1,800 m² 150 people Hybrid-office-based representative modernization €942/m² €860/m² €1,548,837 0% / €0 €1,548,837 2.5x 22 weeks ±12% Comfortable, 90/100 partial glazing retained, local new EI/REI partial replacement existing systems + corrections 252.0 t / 140 kg/m² audit and quality of assets to be retained High retention can reduce cost and CO₂e, but only when the existing elements make technical and functional sense.
    M5Complex modernization 2,600 m² modernization Large modernization in an occupied office 2,600 m² 220 people Hybrid representative modernization €942/m² €1,000/m² €2,600,000 20% / €520,000 €2,080,000 3.3x 25 weeks ±16% Tight fit, 80/100 mixed: Rw 43/49/>50 dB, doors and access control additions + special areas BMS / FAS / phased works 728.0 t / 280 kg/m² phasing, logistics and operational continuity Large modernization can be beneficial, but its risk increases when the works must be phased or carried out while the organization remains operational.
    R1Refurbishment 215 m² Eco Refresh refurbishment Standard reinstatement of a small office 215 m² 16 people Mainly office-based efficient refurbishment €219/m² €219/m² €47,000 0% / €0 €47,000 0.7x 8 weeks ±8% No program change no new glazing systems outside the scope repairs and reinstatement 43.0 t / 200 kg/m² scope of space reinstatement Reinstatement refurbishment is appropriate when the goal is not a new office, but fast standard restoration and cost control.
    R2Refurbishment 500 m² Eco Restore refurbishment Post-tenant refurbishment 500 m² 45 people Mainly office-based reinstatement refurbishment €344/m² €344/m² €172,093 0% / €0 €172,093 1.0x 10 weeks ±10% No major rearrangement repairs / local replacements outside the scope or additional equipment lighting reinstatement and minor installations 120.0 t / 240 kg/m² condition of the acquired space This variant is good for a fast office move-in, provided that the existing layout matches the company's program.
    R3Refurbishment 900 m² with adjustments refurbishment Refurbishment with local functional changes 900 m² 80 people Hybrid reinstatement refurbishment + adjustments €344/m² €414/m² €372,558 0% / €0 €372,558 1.4x 13 weeks ±12% Tight fit, 78/100 local rooms, Rw 43 dB workstation additions electrical / HVAC corrections 252.0 t / 280 kg/m² boundary between refurbishment and modernization If a refurbishment starts to include new rooms, glass and installations, it is worth checking whether it is in fact becoming a modernization.
    R4Refurbishment 1,500 m² Eco Upgrade refurbishment Refurbishment with standard upgrade 1,500 m² 125 people Hybrid-office-based refurbishment with standard upgrade €642/m² €642/m² €962,791 20% / €192,558 €770,233 2.0x 16 weeks ±14% Comfortable, 84/100 partial new glazing Rw 43/49 dB optional workstation package lighting and selected installations upgrade 495.0 t / 330 kg/m² standard upgrade within the existing layout Refurbishment with a standard upgrade makes sense if the layout is largely retained. If the function changes broadly, it should be compared with modernization.
    R5Reinstatement refurbishment 2,400 m² refurbishment Large post-lease standard reinstatement 2,400 m² 210 people Hybrid refurbishment / restore €344/m² €453/m² €1,088,372 0% / €0 €1,088,372 1.7x 18 weeks ±14% Dependent on the existing layout repairs, replacements, local new sections usually outside the scope technical reinstatement and repairs 744.0 t / 310 kg/m² repair scale and technical condition of the space In a large refurbishment, scale itself creates budget risk. The most important step is to understand the technical condition before making a decision.
    Interactive scope comparison

    Compare fit-out, modernization and refurbishment

    Select a scenario to see CAPEX, cost per m², tenant-side cost, landlord contribution, schedule, risk, CO₂e and cost structure. This shows why the scope decision is more important than the rate per square metre alone.

    CAPEX structure by layers

    Cost layers show whether the budget is mainly driven by construction works, finishes, installations or add-ons.

    Works Finishes Installations Add-ons
    Scope
    Area
    Team
    Standard
    Fit-test
    Model risk
    Glazing
    CO₂e
    Ecoffices analytical insight
    Select a scenario to see the insight.
    New office
    full fit-out

    The highest level of control over the final effect and standard, but also the highest share of installations, coordination and technical risks.

    Modernization
    resource retention

    The strongest potential for cost and CO₂e optimization, provided that the existing infrastructure is reliably audited.

    Refurbishment
    standard reinstatement

    The best choice when the layout matches the company's needs and the goal is to restore the space quickly and in a controlled way.

    Current cost bases in the Ecoffices calculator

    The model separates three investment scopes. For fit-out from shell & core, the base points are: €526/m² net for Eco Start, €716/m² net for Eco Flow and €1,209/m² net for Eco Signature. For modernization, the calculator applies separate bases: €321/m² / €486/m² / €942/m² net. For refurbishment / standard reinstatement, the base points are: €219/m² / €344/m² / €642/m² net.

    The base is the starting point. If the user selects a simple scenario without add-ons, the result remains anchored in this value. Only subsequent decisions — glazing, furniture, IT/AV, building systems, design, server room, fast-track mode or logistics — change the budget as separate layers.

    Area per person and minimum air volume

    Automatic area estimation is based on three indicators: 7 m²/person for Eco Start, 9 m²/person for Eco Flow and 12 m²/person for Eco Signature. At the same time, the calculator maintains a minimum air volume of 13 m³/person, so the area result is not just a simple multiplication of the number of people by an area indicator.

    Work model and workstation suggestion

    After entering the number of employees, the calculator suggests the number of assigned and shared desks. A mainly office-based model, a hybrid model and a mainly remote model are interpreted differently. This shows whether the office program is designed for full presence, team rotation or a smaller number of shared workstations.

    Glazing: acoustics, EI / REI and system doors

    In the calculator, glazing is not a simple surcharge to a square metre of office space. It is calculated as a system: glass wall area, doors, acoustics, possible fire resistance, door closers, access control, electrical mullions and glass film. The user selects the parameters in the interface, while unit rates remain server-side.

    In practice, the calculator distinguishes acoustic levels close to Rw 43 dB, Rw 49 dB and higher variants used for more demanding meeting rooms, offices or boardrooms. Glazing with required EI / REI fire resistance should be treated separately, because it is a different system type, not an ordinary percentage surcharge.

    Workstation furniture and equipment

    Workstation furniture is understood as a package: desk, chair and mobile pedestal or cabinet. It does not mean furnishing the entire office. Conference tables, meeting-room chairs, kitchen joinery, reception desk, soft seating and special elements should be treated as separate scope decisions.

    Cost layers: what actually builds CAPEX

    The calculator shows the budget by layers: construction works, finishes, installations and add-ons. The share of these layers differs for fit-out, modernization and refurbishment. In a new fit-out, installations and technical coordination carry more weight. In modernization, the audit of what can be retained becomes more important. In refurbishment, repairs, strip-out works, standard reinstatement and local corrections have a larger share.

    Why scenario comparison matters more than one average price

    One average price per square metre does not answer whether it is better to build a new office, modernize an existing one or carry out reinstatement refurbishment. Only scenario comparison shows where the cost is created, which elements can be retained, how risk changes, how long delivery takes and what budget remains on the tenant side after the landlord contribution is included.

    Conclusion for the investor and tenant
    The most important decision is not choosing one rate per square metre, but selecting the right scenario: new fit-out, modernization or refurbishment. That decision defines the budget structure, risk, time, technical scope and real tenant-side cost.

    Ecoffices CAPEX Engine organizes the investment decision: it shows the cost base, program, area, technical scope, glazing, furniture, systems, resource retention, landlord contribution and risk. As a result, the calculator output is not a random number, but a decision map showing what builds the office budget.

    Frequently asked questions about the office cost calculator

    What exactly does the Ecoffices office cost calculator show?

    The calculator shows an indicative office preparation budget across three scenarios: shell & core fit-out, office refurbishment of an existing space and office refresh without major layout or MEP changes.

    The result is not limited to one rate per square metre. The model shows total cost, cost per m², risk range, delivery time, program area, cost structure, landlord contribution and the budget remaining on the tenant side.

    • construction and finishing works,
    • installations and building systems,
    • glazing, system doors, acoustics and possible EI / REI requirements,
    • workstation furniture, IT / AV / Wi-Fi and fixed joinery,
    • server room / IT back office, if included in the program,
    • resource retention, CO₂e footprint and model risk.
    What is the difference between fit-out, office refurbishment and office refresh in the calculator?

    These are three different investment decisions, so the calculator does not apply one common logic to all of them.

    • Shell & Core Fit-out means delivering an office from shell & core or a very raw starting condition.
    • Office Refurbishment means working with a space left by a previous tenant and checking what can be retained, rebuilt or reused, including parts of HVAC, electrical infrastructure, ceilings, lighting or floor boxes.
    • Office Refresh focuses on repainting, flooring, local repairs and restoring the usable standard without major layout changes and especially without major changes to ventilation, air conditioning or other MEP systems.

    This allows the user to compare not only cost per metre, but also risk, schedule, technical scope and the real tenant-side CAPEX.

    What base cost levels does the calculator use?

    The calculator uses separate base levels for the three investment scopes.

    • Shell & Core Fit-out: Eco Start €526/m² net, Eco Flow €716/m² net, Eco Signature €1,209/m² net.
    • Office Refurbishment: €321/m² / €486/m² / €942/m² net.
    • Office Refresh: €219/m² / €344/m² / €642/m² net.

    These are starting points of the model. The final result changes only after adding the program, glazing, installations, furniture, IT, server room, logistics, resource retention and other design decisions. Source values are calculated in PLN and displayed in EUR using the NBP EUR/PLN rate when available.

    How does the calculator estimate area per person?

    Automatic area estimation is based on the selected standard and work model.

    • Eco Start: approximately 7 m² / person,
    • Eco Flow: approximately 9 m² / person,
    • Eco Signature: approximately 12 m² / person.

    At the same time, the calculator maintains a minimum air volume of 13 m³ / person. This prevents the scenario from becoming too aggressively dense, especially when room height is lower.

    Does the calculator suggest the number of assigned and shared desks?

    Yes. After entering the number of employees and selecting the work model, the calculator suggests how many desks should be assigned and how many should be shared.

    This matters because the cost of an office does not come only from the number of employees, but from the number of physical workstations, meeting rooms, support areas and real user occupancy. A mainly office-based model produces a different result than a hybrid model.

    What has the strongest impact on the budget result?

    The strongest driver is not the area alone, but the complexity of the scenario.

    • number of meeting rooms, offices and enclosed rooms,
    • share of glazing and acoustic requirements,
    • installations, HVAC, electrical works, FAS, BMS and sprinklers,
    • furniture, IT / AV / Wi-Fi and fixed joinery,
    • server room, IT power, cooling and RACK cabinets,
    • building logistics, fast-track mode and landlord requirements,
    • resource retention level in office refurbishment or office refresh.

    This is why two offices with the same area can have completely different CAPEX levels.

    How does the calculator treat glazing?

    Glazing is not calculated as a simple surcharge to office area. In the Ecoffices model, it is a separate cost system.

    The calculator includes, among other things:

    • glass wall area in meeting rooms and offices,
    • system doors,
    • acoustic standard: approximately Rw 43 dB, Rw 49 dB or solutions above 50 dB,
    • possible EI / REI requirements,
    • door closers, access control, electrical mullions and glass film.

    Unit prices for glazing are not shown on the front end. They are calculated server-side.

    What does workstation furniture mean in the calculator?

    Workstation furniture means a package for a workstation, not full furnishing of the entire office.

    In the current model, this includes:

    • desk,
    • chair,
    • mobile pedestal or cabinet.

    Conference tables, meeting-room chairs, soft seating, kitchen joinery, reception desk and other elements may belong to other cost layers.

    How does a server room affect office preparation cost?

    A server room affects more than one cost line.

    In the calculator, it can increase:

    • program area,
    • electrical and power supply cost,
    • cooling and HVAC cost,
    • cabling and IT scope,
    • coordination risk and delivery time.

    The higher the number of RACK cabinets, IT power and cooling requirements, the stronger the impact on the budget and installations.

    What cost layers does the calculator show?

    The calculator presents the budget as a structure, not just a total.

    • Construction works — walls, ceilings, floors, painting and execution works.
    • Finishes and built-ins — glass, fixed joinery, woodwork, kitchens and reception desk.
    • Installations and systems — HVAC, electrical works, plumbing, FAS, BMS, sprinklers and IT / AV.
    • Add-ons — design, PM, furniture, fast-track, server room and other options.

    The distribution of these layers is different for shell & core fit-out, office refurbishment and office refresh.

    How does the calculator estimate delivery time?

    Delivery time comes from scale, scope and technical complexity.

    The model indicatively includes:

    • time for design and coordination,
    • approvals with the landlord / building owner,
    • execution time for the works,
    • commissioning, handover and buffer.

    Fast-track mode may shorten the schedule, but usually increases cost, risk and organizational pressure.

    What does the risk range mean?

    The risk range shows the possible deviation of the budget from the base scenario result.

    It is affected by, among other things:

    • quality of input data,
    • uncertainty of the technical scope,
    • building class and building requirements,
    • number of approvals, changes and clashes,
    • logistics and availability of teams and materials.

    It is a deliberate model reserve, not a calculator error.

    How does the calculator include landlord contribution?

    The calculator separates the total project cost from the cost remaining on the tenant side.

    Landlord contribution / fit-out contribution can reduce the budget that the tenant actually finances. This does not mean that the project itself costs less — it changes the financing split.

    This makes it easier to compare lease scenarios, negotiate terms and check how CAPEX relates to annual rent.

    How does resource retention work in office refurbishment and office refresh?

    Resource retention means using part of the existing elements instead of building everything from scratch.

    It may include, among other things:

    • part of the installations,
    • walls, ceilings and floors,
    • lighting fixtures, floor boxes and infrastructure elements,
    • selected built-ins or equipment.

    Retention can reduce cost and the simplified carbon footprint, but it requires an audit of the existing condition.

    How does the calculator show the CO₂e footprint?

    The carbon footprint in the calculator is a simplified model used to compare decisions, not a full LCA audit.

    The model shows how the indicative CO₂e result changes across different scopes, standards, resource retention levels and technical decisions.

    A full environmental audit would require material data, EPDs, actual quantities and detailed design documentation.

    What does the PDF report from the calculator provide?

    The PDF report organizes the scenario for a discussion with the management board, project team or Ecoffices.

    The report contains the key information: total cost, cost per m², area, scope, cost structure, risk, schedule, technical parameters and model assumptions.

    It is not a commercial offer, but a clear decision-making material before discussing the scope and documentation.

    What is the difference between CAPEX and OPEX in an office context?

    CAPEX is the investment budget needed to prepare the office, while OPEX is the ongoing cost of using it.

    • CAPEX: fit-out, office refurbishment, office refresh, installations, glazing, built-ins, furniture, IT / AV and design.
    • OPEX: rent, service charge, utilities, cleaning, security, services and ongoing maintenance.

    When making a lease decision, it is worth looking at both levels, because low CAPEX does not always mean the cheapest office over the whole period of use.

    Is the calculator result a commercial offer?

    No. The calculator result is an indicative budget estimate and a material for preliminary decision-making.

    An accurate offer requires documentation, floor plans, building guidelines, trade scope, site inspection, landlord approvals and confirmation of the execution standard.

    The calculator helps you enter the budget discussion faster, but it does not replace design documentation or a contractor quotation.

    What data is worth preparing before using the calculator?

    A few pieces of information are enough for a preliminary calculation, but the better the data, the more useful the result.

    • planned area or number of employees,
    • work model: office-based, hybrid or remote,
    • number of desks, meeting rooms, offices and support areas,
    • scope: shell & core fit-out, office refurbishment or office refresh,
    • expected standard, glazing, furniture, IT / AV and server room,
    • information about landlord contribution, if known.