02 Investment budget

How much does an office fit-out cost? Calculate your investment budget.

Office fit-out, modernization and refurbishment cost calculator estimates the indicative investment budget, delivery cost per m² and a safe budget range. It takes into account the scope of works, standard, functional program, MEP installations, building systems, equipment and delivery conditions. After entering the landlord contribution, it also shows the tenant-side entry cost.

Explore our fit-out service
Entry-cost breakdown Budget structure
Eco Flow Fit-out Eco Refit Modernization Eco Restore Refurbishment
Strip-out and preparation
Walls, ceilings and floors
Electrical and low-voltage systems
Ventilation, air conditioning and plumbing
Joinery and built-ins
Furniture, equipment and multimedia
Design, coordination and contingency
Average scope cost Scope and standard affect the result Indicative workstation cost
Assumed landlord contribution
Tenant-side cost After landlord contribution
Indicative net values · EUR Assumption: 12 m² / workstation
Ecoffices • Decision Console

How much will it cost to prepare the office?

Enter the key assumptions and you will immediately see the indicative budget, fit-out cost per 1 m² and a safe investment range.
1 Brief for an initial estimate
Enter the basic information about the office. This is enough to get a quick first result and continue to the advanced analysis.
Number of employees (target)
The headcount helps assess occupancy and workplace capacity. By itself it does not increase the base fit-out rate per m².
Work model
Programme details (meeting rooms, offices, kitchenettes, server room)
In the advanced analysis, a more extensive programme — more meeting rooms, offices, storage rooms and other enclosed zones — increases layout and multidisciplinary coordination costs. The floor area remains unchanged.
Workstations

Guidance

Workstation ratio
workstations / employee
Share of shared desks
share of 4h workstations
Modelled attendance
people at the same time
Meeting rooms
Additional meeting-room glazing
Glazing included in the selected standard is already reflected in the base rate. Enable this option only for additional scope.
Private offices
Additional office glazing
Glazing included in the selected standard is already reflected in the base rate. Enable this option only for additional scope.
Glazing parameters
Enabled after glazing is selected for meeting rooms or offices.
Additional functions (kitchenette, storage)
Server room / IT facilities
A dedicated server room increases the programme area and raises the cost of electrical, ventilation, air-conditioning and cooling systems.
2 Construction parameters
01
Area and baseline Floor area used for the calculation and the base rate of the selected variant.
The budget is calculated for the specified area, so you immediately see the cost of preparing the actual office under review.
The base rate reflects the selected scope of works and standard.
02
Fit-out standard Select the variant that matches the expected level of materials and solutions.
Eco Start
Eco Flow
Eco Signature
03
Scope and logistics Type of works, site constraints and the impact of an accelerated schedule.
Landlord contribution
Fit-out: 200–700 EUR/m².
Modernisation / refurbishment: 100–500 EUR/m². Values are converted to the internal PLN calculation base using the current NBP table A EUR/PLN rate.
04
Investment options Building, layout, design and planned start-date parameters.
Advanced (fire systems, project management, resource retention)
3 Furniture and IT
Use the full office-start-up budget as the headline result: fit-out plus workstation furniture and IT / AV. Meeting-room furniture is added according to the programme in the advanced analysis. Both budget levels are always calculated and compared below.
01
Workstation and meeting-room furniture Workstation furniture and meeting-room equipment in line with the programme.
Calculation basisfrom the workstation and meeting-room programme
Furniture is always calculated in the parallel ready-to-work office budget.
02
IT / multimedia / Wi‑Fi User infrastructure budget per workstation.
UnitPLN / workstation
03
Built-in elements Kitchens, cabinets, reception desks and other bespoke built-in elements.
UnitPLN / m² of office area
Link copied to clipboard.
The values are invalid. The minimum area is 30 m².
Verify the scenario with an Ecoffices engineer
Send the full calculator parameter set to the Ecoffices team. After submission, we save the technical assumptions and can send a scenario summary to the email address provided.
This is a solid starting point for a budget discussion. The final quotation depends on the scope, standard and delivery conditions.
Ecoffices report (live)
Changing the parameters updates the indicators and charts.
Estimated budget (NET)
Indicative, based on the calculator parameters
Cost / m² (NET)
Base rate and scenario adjustments
Safe budget range (net)
Delivery time
Occupancy / capacity
Indicative capacity of this floor area

Fit-out vs ready-to-work office

Two budget levels calculated in parallel for the same scenario.
Selected: fit-out
Fit-out
Ready-to-work office
Difference: furniture, IT/AV and PM Workstation furniture + IT / AV + allocated PM; meeting-room furniture according to the programme in the advanced analysis.

Calculation summary

Calculation scope

Cost breakdown (model)

Cost waterfall: how the budget builds up

See which decisions increase the budget most and how the total investment cost changes.

Cost structure (list)

    Ecoffices CAPEX Engine — office calculation methodology

    How the Ecoffices calculator estimates office CAPEX: scope, standard, area, glazing and comparison scenarios

    The Ecoffices calculator is not a simple area multiplied by one average rate. Its purpose is to show how the office preparation budget changes depending on the investment scope, standard, functional program, installations, glazing, furniture, resource retention, landlord contribution, risk and delivery time. In this section, we explain the transparent assumptions of the model: what the user should understand before interpreting the result.

    Three investment scopes
    The model separates fit-out from shell & core, modernization of an existing office and refurbishment / standard reinstatement. Each scope has a different base and a different cost structure.
    Base cost as the starting point
    If add-ons are disabled, the result starts from the base. Glass, furniture, IT/AV, systems and PM are added as separate decisions, not hidden mark-ups to the rate.
    Decision comparison
    The scenarios show not only different areas, but the real investor choice: new office, modernization or reinstatement refurbishment.
    Ecoffices CAPEX Engine comparison dataset

    15 office investment scenarios: fit-out, modernization and refurbishment

    The set below is not a price list. It is a structured scenario dataset showing the differences between three decisions: building a new office from shell & core, modernizing an existing space and refurbishing / reinstating the standard. This makes it possible to compare not only cost per m², but also technical scope, risk, time, landlord contribution and the cost that remains on the tenant side.

    Number of scenarios 15 5 fit-out · 5 modernization · 5 refurbishment
    Area range 215–2,600 m² from a small office to a large headquarters
    CAPEX / m² range €219–€1,442/m² depending on scope and standard
    Decision type build / reuse / restore new office, retention or reinstatement
    How to read the scenarios: values are model-based and indicative. The purpose is not to provide one market price, but to show what happens to the budget when the investment scope, functional program, glazing acoustics, EI / REI requirements, technology, resource retention and landlord contribution change. Amounts are displayed in EUR. Source values are calculated in PLN and converted using the NBP EUR/PLN rate when available.
    Office CAPEX comparison scenarios — Ecoffices CAPEX Engine 2026
    ScenarioScopeInvestment profileAreaTeamWork modelStandardBase / m²CAPEX / m²CAPEX netLandlord contributionTenant CAPEXCAPEX vs rentScheduleRiskFit-testGlazingFurnitureSystemsCO₂eMain driverConclusion
    F1Fit-out 215 m² Eco Startfit-outSmall office from shell & core215 m²16 peopleMainly office-basedEco Start€526/m²€526/m²€113,0000% / €0€113,0001.7x20 weeks±10%Tight fit, 72/100optional, standard acousticsoutside the base / optionalbasic31.3 t / 146 kg/m²fit-out base and simple programThis scenario shows a reference point for a new office in the Eco Start variant. With add-ons disabled, the cost remains anchored in the base and the result is clear for discussing further options.
    F2Fit-out 480 m² Eco Flowfit-outBusiness office with meeting rooms480 m²46 peopleHybridEco Flow€716/m²€802/m²€385,11622% / €86,047€299,0702.4x21 weeks±12%Comfortable, 84/100approx. Rw 43 dB, selected roomsoptional workstation packageFAS / basic approvals108.0 t / 225 kg/m²meeting rooms, glazing and HVACA typical business-office scenario. The difference versus the base comes from the program, glazing and an extended technical layer, not only from area.
    F3Fit-out 950 m² Eco Flow + ITfit-outOffice with more meeting rooms and IT950 m²86 peopleHybridEco Flow€716/m²€926/m²€879,30225% / €216,279€663,0233.1x23 weeks±14%Tight fit, 80/100approx. Rw 49 dB, meeting rooms + officespartly includedFAS, basic BMS, IT/AV285.0 t / 300 kg/m²IT/AV, glazing and installationsIn this variant, the cost increases through technical elements: IT/AV, a higher share of glazing and more intensive installation coordination.
    F4Fit-out 1,500 m² Eco Signaturefit-outRepresentative office for a service company1,500 m²125 peopleOffice-based hybridEco Signature€1,209/m²€1,349/m²€2,023,25628% / €566,512€1,456,7444.0x25 weeks±16%Tight fit, 82/100enhanced acoustics, selected EI/REIworkstation package + common areasFAS, BMS, sprinklers, extended AV690.0 t / 460 kg/m²representative standard and systemsThis scenario shows that a high standard quickly multiplies CAPEX. The key is to separate the visual effect from technical and system requirements.
    F5Fit-out 2,400 m² HQfit-outHeadquarters with server room and technology2,400 m²200 peopleHybrid-office-basedEco Signature€1,209/m²€1,442/m²€3,460,46528% / €968,930€2,491,5354.4x25 weeks±16%Tight fit, 79/100Rw 49 dB and >50 dB, EI/REI possiblefull workstation package as an optionFAS / voice alarm / BMS / sprinklers / server room1128.0 t / 470 kg/m²scale, server room and building systemsIn a large HQ, the cost difference does not come from a single material, but from the sum of decisions: layout, systems, server room, AV/IT, glazing and logistics.
    M1Modernization 300 m²modernizationLocal rearrangement of an existing office300 m²30 peopleMainly office-basedefficient modernization€321/m²€356/m²€106,7440% / €0€106,7441.2x14 weeks±10%Comfortable, 86/100existing walls retainedoptional additionslocal corrections57.0 t / 190 kg/m²intervention scope in the existing layoutThe greatest value of modernization is the ability to use what already exists. The cost depends on the existing-condition audit and the scale of functional changes.
    M2Modernization 700 m² Eco FlowmodernizationModernization with partial resource retention700 m²64 peopleHybridcomfortable modernization€486/m²€523/m²€366,2790% / €0€366,2791.8x17 weeks±12%Comfortable, 88/100partial retention, new rooms Rw 43/49 dBpartial workstation additionslocal HVAC / electrical works119.0 t / 170 kg/m²resource retention and meeting room change scopeThis scenario clearly shows the advantage of modernization: lower CAPEX and a lower carbon footprint when part of the infrastructure is retained.
    M3Technical modernization 1,100 m²modernizationRearrangement with major installation changes1,100 m²100 peopleHybridcomfortable modernization€486/m²€616/m²€677,90720% / €135,581€542,3262.4x20 weeks±14%Tight fit, 81/100new rooms Rw 49 dB, some system doorsoptional workstation packageFAS / BMS depending on the building231.0 t / 210 kg/m²installation clashes and layout changeTechnical modernization requires caution: the cost may approach a new fit-out if layout changes trigger a broad rebuild of installations.
    M4Modernization 1,800 m² with retentionmodernizationLarge office with high resource retention1,800 m²150 peopleHybrid-office-basedrepresentative modernization€942/m²€860/m²€1,548,8370% / €0€1,548,8372.5x22 weeks±12%Comfortable, 90/100partial glazing retained, local new EI/REIpartial replacementexisting systems + corrections252.0 t / 140 kg/m²audit and quality of assets to be retainedHigh retention can reduce cost and CO₂e, but only when the existing elements make technical and functional sense.
    M5Complex modernization 2,600 m²modernizationLarge modernization in an occupied office2,600 m²220 peopleHybridrepresentative modernization€942/m²€1,000/m²€2,600,00020% / €520,000€2,080,0003.3x25 weeks±16%Tight fit, 80/100mixed: Rw 43/49/>50 dB, doors and access controladditions + special areasBMS / FAS / phased works728.0 t / 280 kg/m²phasing, logistics and operational continuityLarge modernization can be beneficial, but its risk increases when the works must be phased or carried out while the organization remains operational.
    R1Refurbishment 215 m² Eco RefreshrefurbishmentStandard reinstatement of a small office215 m²16 peopleMainly office-basedefficient refurbishment€219/m²€219/m²€47,0000% / €0€47,0000.7x8 weeks±8%No program changeno new glazing systemsoutside the scoperepairs and reinstatement43.0 t / 200 kg/m²scope of space reinstatementReinstatement refurbishment is appropriate when the goal is not a new office, but fast standard restoration and cost control.
    R2Refurbishment 500 m² Eco RestorerefurbishmentPost-tenant refurbishment500 m²45 peopleMainly office-basedreinstatement refurbishment€344/m²€344/m²€172,0930% / €0€172,0931.0x10 weeks±10%No major rearrangementrepairs / local replacementsoutside the scope or additional equipmentlighting reinstatement and minor installations120.0 t / 240 kg/m²condition of the acquired spaceThis variant is good for a fast office move-in, provided that the existing layout matches the company's program.
    R3Refurbishment 900 m² with adjustmentsrefurbishmentRefurbishment with local functional changes900 m²80 peopleHybridreinstatement refurbishment + adjustments€344/m²€414/m²€372,5580% / €0€372,5581.4x13 weeks±12%Tight fit, 78/100local rooms, Rw 43 dBworkstation additionselectrical / HVAC corrections252.0 t / 280 kg/m²boundary between refurbishment and modernizationIf a refurbishment starts to include new rooms, glass and installations, it is worth checking whether it is in fact becoming a modernization.
    R4Refurbishment 1,500 m² Eco UpgraderefurbishmentRefurbishment with standard upgrade1,500 m²125 peopleHybrid-office-basedrefurbishment with standard upgrade€642/m²€642/m²€962,79120% / €192,558€770,2332.0x16 weeks±14%Comfortable, 84/100partial new glazing Rw 43/49 dBoptional workstation packagelighting and selected installations upgrade495.0 t / 330 kg/m²standard upgrade within the existing layoutRefurbishment with a standard upgrade makes sense if the layout is largely retained. If the function changes broadly, it should be compared with modernization.
    R5Reinstatement refurbishment 2,400 m²refurbishmentLarge post-lease standard reinstatement2,400 m²210 peopleHybridrefurbishment / restore€344/m²€453/m²€1,088,3720% / €0€1,088,3721.7x18 weeks±14%Dependent on the existing layoutrepairs, replacements, local new sectionsusually outside the scopetechnical reinstatement and repairs744.0 t / 310 kg/m²repair scale and technical condition of the spaceIn a large refurbishment, scale itself creates budget risk. The most important step is to understand the technical condition before making a decision.
    Interactive scope comparison

    Compare fit-out, modernization and refurbishment

    Select a scenario to see CAPEX, cost per m², tenant-side cost, landlord contribution, schedule, risk, CO₂e and cost structure. This shows why the scope decision is more important than the rate per square metre alone.

    CAPEX structure by layers

    Cost layers show whether the budget is mainly driven by construction works, finishes, installations or add-ons.

    Works Finishes Installations Add-ons
    Scope
    Area
    Team
    Standard
    Fit-test
    Model risk
    Glazing
    CO₂e
    Ecoffices analytical insight
    Select a scenario to see the insight.
    New office
    full fit-out

    The highest level of control over the final effect and standard, but also the highest share of installations, coordination and technical risks.

    Modernization
    resource retention

    The strongest potential for cost and CO₂e optimization, provided that the existing infrastructure is reliably audited.

    Refurbishment
    standard reinstatement

    The best choice when the layout matches the company's needs and the goal is to restore the space quickly and in a controlled way.

    Current cost bases in the Ecoffices calculator

    The model separates three investment scopes. For fit-out from shell & core, the base points are: €526/m² net for Eco Start, €716/m² net for Eco Flow and €1,209/m² net for Eco Signature. For modernization, the calculator applies separate bases: €321/m² / €486/m² / €942/m² net. For refurbishment / standard reinstatement, the base points are: €219/m² / €344/m² / €642/m² net.

    The base is the starting point. If the user selects a simple scenario without add-ons, the result remains anchored in this value. Only subsequent decisions — glazing, furniture, IT/AV, building systems, design, server room, fast-track mode or logistics — change the budget as separate layers.

    Area per person and minimum air volume

    Automatic area estimation is based on three indicators: 7 m²/person for Eco Start, 9 m²/person for Eco Flow and 12 m²/person for Eco Signature. At the same time, the calculator maintains a minimum air volume of 13 m³/person, so the area result is not just a simple multiplication of the number of people by an area indicator.

    Work model and workstation suggestion

    After entering the number of employees, the calculator suggests the number of assigned and shared desks. A mainly office-based model, a hybrid model and a mainly remote model are interpreted differently. This shows whether the office program is designed for full presence, team rotation or a smaller number of shared workstations.

    Glazing: acoustics, EI / REI and system doors

    In the calculator, glazing is not a simple surcharge to a square metre of office space. It is calculated as a system: glass wall area, doors, acoustics, possible fire resistance, door closers, access control, electrical mullions and glass film. The user selects the parameters in the interface, while unit rates remain server-side.

    In practice, the calculator distinguishes acoustic levels close to Rw 43 dB, Rw 49 dB and higher variants used for more demanding meeting rooms, offices or boardrooms. Glazing with required EI / REI fire resistance should be treated separately, because it is a different system type, not an ordinary percentage surcharge.

    Workstation furniture and equipment

    Workstation furniture is understood as a package: desk, chair and mobile pedestal or cabinet. It does not mean furnishing the entire office. Conference tables, meeting-room chairs, kitchen joinery, reception desk, soft seating and special elements should be treated as separate scope decisions.

    Cost layers: what actually builds CAPEX

    The calculator shows the budget by layers: construction works, finishes, installations and add-ons. The share of these layers differs for fit-out, modernization and refurbishment. In a new fit-out, installations and technical coordination carry more weight. In modernization, the audit of what can be retained becomes more important. In refurbishment, repairs, strip-out works, standard reinstatement and local corrections have a larger share.

    Why scenario comparison matters more than one average price

    One average price per square metre does not answer whether it is better to build a new office, modernize an existing one or carry out reinstatement refurbishment. Only scenario comparison shows where the cost is created, which elements can be retained, how risk changes, how long delivery takes and what budget remains on the tenant side after the landlord contribution is included.

    Conclusion for the investor and tenant
    The most important decision is not choosing one rate per square metre, but selecting the right scenario: new fit-out, modernization or refurbishment. That decision defines the budget structure, risk, time, technical scope and real tenant-side cost.

    Ecoffices CAPEX Engine organizes the investment decision: it shows the cost base, program, area, technical scope, glazing, furniture, systems, resource retention, landlord contribution and risk. As a result, the calculator output is not a random number, but a decision map showing what builds the office budget.

    Frequently asked questions about the office cost calculator

    What exactly does the Ecoffices office cost calculator show?

    The calculator shows an indicative office preparation budget across three scenarios: fit-out from shell & core, modernization of an existing office and refurbishment / standard reinstatement.

    The result is not limited to one rate per square metre. The model shows total cost, cost per m², risk range, delivery time, program area, cost structure, landlord contribution and the budget remaining on the tenant side.

    • construction and finishing works,
    • installations and building systems,
    • glazing, system doors, acoustics and possible EI / REI requirements,
    • workstation furniture, IT / AV / Wi-Fi and fixed joinery,
    • server room / IT back office, if included in the program,
    • resource retention, CO₂e footprint and model risk.
    What is the difference between fit-out, modernization and refurbishment in the calculator?

    These are three different investment decisions, so the calculator does not apply one common logic to all of them.

    • Fit-out means preparing an office from developer standard or another very raw starting condition.
    • Modernization means working with an existing office and assessing what can be retained, rebuilt or reused.
    • Refurbishment / standard reinstatement focuses on repairs, replacements, refreshing finishes and restoring the space to the expected standard.

    This allows the user to compare not only cost per m², but also risk, schedule, technical scope and the real tenant-side CAPEX.

    What base cost levels does the calculator use?

    The calculator uses separate base levels for the three investment scopes.

    • Fit-out from Shell & Core: Eco Start PLN 2,260/m² net, Eco Flow PLN 3,080/m² net, Eco Signature PLN 5,200/m² net.
    • Modernization: PLN 1,380/m² / PLN 2,090/m² / PLN 4,050/m² net.
    • Refurbishment / Standard Reinstatement: PLN 940/m² / PLN 1,480/m² / PLN 2,760/m² net.

    These are the model’s starting points. The final result changes only after adding the functional program, glazing, installations, furniture, IT, server room, logistics, resource retention and other design decisions.

    How does the calculator estimate area per person?

    Automatic area estimation is based on the selected standard and work model.

    • Eco Start: approximately 7 m² / person,
    • Eco Flow: approximately 9 m² / person,
    • Eco Signature: approximately 12 m² / person.

    At the same time, the calculator maintains a minimum air volume of 13 m³ / person. This prevents the scenario from becoming too aggressively dense, especially when room height is lower.

    Does the calculator suggest the number of assigned and shared desks?

    Yes. After entering the number of employees and selecting the work model, the calculator suggests how many desks should be assigned and how many should be shared.

    This matters because the cost of an office does not come only from the number of employees, but from the number of physical workstations, meeting rooms, support areas and real user occupancy. A mainly office-based model produces a different result than a hybrid model.

    What has the strongest impact on the budget result?

    The strongest driver is not the area alone, but the complexity of the scenario.

    • number of meeting rooms, offices and enclosed rooms,
    • share of glazing and acoustic requirements,
    • installations, HVAC, electrical works, FAS, BMS and sprinklers,
    • furniture, IT / AV / Wi-Fi and fixed joinery,
    • server room, IT power, cooling and RACK cabinets,
    • building logistics, fast-track mode and landlord requirements,
    • resource retention level in modernization or refurbishment.

    This is why two offices with the same area can have completely different CAPEX levels.

    How does the calculator treat glazing?

    Glazing is not calculated as a simple surcharge to office area. In the Ecoffices model, it is a separate cost system.

    The calculator includes, among other things:

    • glass wall area in meeting rooms and offices,
    • system doors,
    • acoustic standard: approximately Rw 43 dB, Rw 49 dB or solutions above 50 dB,
    • possible EI / REI requirements,
    • door closers, access control, electrical mullions and glass film.

    Unit prices for glazing are not shown on the front end. They are calculated server-side.

    What does workstation furniture mean in the calculator?

    Workstation furniture means a package for a workstation, not full furnishing of the entire office.

    In the current model, this includes:

    • desk,
    • chair,
    • mobile pedestal or cabinet.

    Conference tables, meeting-room chairs, soft seating, kitchen joinery, reception desk and other elements may belong to other cost layers.

    How does a server room affect office preparation cost?

    A server room affects more than one cost line.

    In the calculator, it can increase:

    • program area,
    • electrical and power supply cost,
    • cooling and HVAC cost,
    • cabling and IT scope,
    • coordination risk and delivery time.

    The higher the number of RACK cabinets, IT power and cooling requirements, the stronger the impact on the budget and installations.

    What cost layers does the calculator show?

    The calculator presents the budget as a structure, not just a total.

    • Construction works — walls, ceilings, floors, painting and execution works.
    • Finishes and built-ins — glass, fixed joinery, woodwork, kitchens and reception desk.
    • Installations and systems — HVAC, electrical works, plumbing, FAS, BMS, sprinklers and IT / AV.
    • Add-ons — design, PM, furniture, fast-track, server room and other options.

    The distribution of these layers is different for fit-out, modernization and refurbishment.

    How does the calculator estimate delivery time?

    Delivery time comes from scale, scope and technical complexity.

    The model indicatively includes:

    • time for design and coordination,
    • approvals with the landlord / building owner,
    • execution time for the works,
    • commissioning, handover and buffer.

    Fast-track mode may shorten the schedule, but usually increases cost, risk and organizational pressure.

    What does the risk range mean?

    The risk range shows the possible deviation of the budget from the base scenario result.

    It is affected by, among other things:

    • quality of input data,
    • uncertainty of the technical scope,
    • building class and building requirements,
    • number of approvals, changes and clashes,
    • logistics and availability of teams and materials.

    It is a deliberate model reserve, not a calculator error.

    How does the calculator include landlord contribution?

    The calculator separates the total project cost from the cost remaining on the tenant side.

    Landlord contribution / fit-out contribution can reduce the budget that the tenant actually finances. This does not mean that the project itself costs less — it changes the financing split.

    This makes it easier to compare lease scenarios, negotiate terms and check how CAPEX relates to annual rent.

    How does resource retention work in modernization and refurbishment?

    Resource retention means using part of the existing elements instead of building everything from scratch.

    It may include, among other things:

    • part of the installations,
    • walls, ceilings and floors,
    • lighting fixtures, floor boxes and infrastructure elements,
    • selected built-ins or equipment.

    Retention can reduce cost and the simplified carbon footprint, but it requires an audit of the existing condition.

    How does the calculator show the CO₂e footprint?

    The carbon footprint in the calculator is a simplified model used to compare decisions, not a full LCA audit.

    The model shows how the indicative CO₂e result changes across different scopes, standards, resource retention levels and technical decisions.

    A full environmental audit would require material data, EPDs, actual quantities and detailed design documentation.

    What does the PDF report from the calculator provide?

    The PDF report organizes the scenario for a discussion with the management board, project team or Ecoffices.

    The report contains the key information: total cost, cost per m², area, scope, cost structure, risk, schedule, technical parameters and model assumptions.

    It is not a commercial offer, but a clear decision-making material before discussing the scope and documentation.

    What is the difference between CAPEX and OPEX in an office context?

    CAPEX is the investment budget needed to prepare the office, while OPEX is the ongoing cost of using it.

    • CAPEX: fit-out, modernization, refurbishment, installations, glazing, built-ins, furniture, IT / AV and design.
    • OPEX: rent, service charge, utilities, cleaning, security, services and ongoing maintenance.

    When making a lease decision, it is worth looking at both levels, because low CAPEX does not always mean the cheapest office over the whole period of use.

    Is the calculator result a commercial offer?

    No. The calculator result is an indicative budget estimate and a material for preliminary decision-making.

    An accurate offer requires documentation, floor plans, building guidelines, trade scope, site inspection, landlord approvals and confirmation of the execution standard.

    The calculator helps you enter the budget discussion faster, but it does not replace design documentation or a contractor quotation.

    What data is worth preparing before using the calculator?

    A few pieces of information are enough for a preliminary calculation, but the better the data, the more useful the result.

    • planned area or number of employees,
    • work model: office-based, hybrid or remote,
    • number of desks, meeting rooms, offices and support areas,
    • scope: fit-out, modernization or refurbishment,
    • expected standard, glazing, furniture, IT / AV and server room,
    • information about landlord contribution, if known.